Video Playlist - https://www.youtube.com/playlist?list=PLh0KqGKtX4oUx1QfEanr9y-LOE9SQ9j5n
- Poly on floor sealed to footing
- Poly sealed against all extrusions
- Post installed before concrete
- Passive radon pipe installed
- Rebar added.
https://www.youtube.com/watch?v=tjcCOZStFnw



Sill Plate Install
- add concrete bolts post foundation pour for ease
- add sill gasket
- add 2x4 around sill (fire guard) in order to be able nail up drywall so that the insulation is not exposed to fire.
https://www.youtube.com/watch?v=cvvng21UpWY

Floor Joists
- Add piece of wood where rim board meets rim board
https://www.youtube.com/watch?v=HF3nnO7Gsfo&t=9s

Sub Floor
- chalk line to start
- 1/8" gap between boards
- add adhesive on rim and floor joists
- use screws
- screws every 6-8" around the edges and every 12" elsewhere
- screws back 1.5" from edge
- overhang ok, can trim
- stagger your joints
https://www.youtube.com/watch?v=d0Su7RWG2Rk