Exterior Work
- fiberglass lock hole
- remove windows
- remove belly band
- remove door trim
- fix bolts for door
- get replacement windows for front and back - plexiglass
- have gaskets
- Polish windows
- Polish belly band
replace outside AC plug- sand
- fill cracks
- remove silicon
- redo fan
- paint
- put everything back
Interior
- fill/repair interior pieces
- paint interior pieces
- new counter
- new sink
- new stove ?
- bed lift
- new mattress
- cushion covers
- relocate electrical
- screen door
Questions
- Should I replace fridge? Should I add venting for it?
What can I do now?
bearings- figure out fridge
- figure out water... reservoir under sink or outside
...
Item | Work | Complete |
---|---|---|
Exterior | Sand, Fill Cracks, Paint | |
Door bolts | Replace | |
Lock | Finish around door lock/bolt | |
Belly Band | Polish | |
Front and Back Windows | Replace with 4.5mm plexiglass - Centenial Glass | |
Jealousy Windows | Remove, polish and re-install | |
Door | Replace trim/edging |
Interior Work
Item | Work | Complete |
---|---|---|
Interior Cabinets | Remove, Patch, Fiberglass, Paint? | |
Bed | Add bed lift | Done |
Counter | Add butcher block counter | |
Stove | Replace Stove | |
Sink | Replace Sink | |
Bunk Beds | New Covers | |
Mattress | Size properly | |
Screen Door | Add | |
Water Pump | Add | |
Fridge | Replace and add venting |
...