Drawing


Things to Think About


  • Internal walls
    • drainage under walls (dimpled membrane/platon or PVC shims)
    • pressure treated for bottom plate 
    • polly wrapped around bottom plate
    • typar behind wall to hold in fiberglass
    • 1/2 - 1" gap between concrete and wall
    • fiberglass pink insulation R16?
    • vapour barrier on hot side


  • Upper Stair Wall
    • strap wall for drywall?


  • Under Stair Wall
    • Wall from mid stairs 
    • need to figure out storage under stairs
      • drawers?
      • doors?


  • Flooring
    • decide on vinyl flooring


  • Other
    • parge exterior wall along stairs (upper and lower)
    • remove rock from under stairs and re-concrete?


  • Bathroom 
    • Need to decide on shower pan/toilet/etc. and determine bathroom dimensions to accommodate 
    • Later
      • fix drain locations
      • Install 


  • Fireplace/heat source?


Supplies

Wall Construction

  • 2x4s
  • 2x4 pressure treated 
  • strapping for wall and ceiling
  • shims
  • screws/nails - Bryan to supply nails ?
  • platon/PVC shims
  • tapcon screws
  • poly
  • Typar


Flooring

  • vinyl planking
  • ??


Electrical

  • wire
  • pot lights
  • plugs
  • etc.. 


Insulation

  • 16" 2x4 fiberglass pink insulation


Drywall

  • drywall
  • mud
  • fiber tape


Tasks in Order

TaskOwnerStatus
  • Decide on shower pan/toilet/etc. and determine bathroom dimensions to accommodate 
Jenny
  • Decide on Flooring
Jenny
  • Fireplace or other heat source?
Jenny
  • Bolt other beams together
Me
  • Stone Removal and concrete
Me
  • Parging
Me
  • Wall construction
Bryan
  • Flooring
Bryan
  • Electrical
Me
  • Insulation
Bryan
  • Drywall
Bryan
  • Bathroom (later)
Me


Files

FileLink
Visio Drawing



  • No labels